Bystronic Decommission and Loading
In June 2020, We decommissioned and loaded Bystronic line for shipment abroad....
In June 2020, We decommissioned and loaded Bystronic line for shipment abroad....
In June 2020, We decommissioned and loaded a Lisec line for shipment abroad....
Between September - November 2017 Genco removed an old unreliable furnace and replaced with a newer modern machine. The installation had to be swift in order to keep downtime to a minimum however there were many modifications needed to make the new furnace fit in...
In July 2017 Genco completed the upgrade to Yuntong furnace in Copenhagen. This included removal of the old system, installation and training. Project took 2 weeks....