20 November
Between September – November 2017 Genco removed an old unreliable furnace and replaced with a newer modern machine. The installation had to be swift in order to keep downtime to a minimum however there were many modifications needed to make the new furnace fit in the same location. The total project from machine shutdown to production on the new plant took six weeks.